Stanlow Minimum Offtake Connection

The scope of works included the following;

  • Site setup and provision of welfare arrangements
  • Temporary works design
  • Removal of existing coating from 18” main and preparation of the pipework prior to the installation of the grouted tee
  • Support and attendance on PMC
  • Associated civils
  • Welding, fabrication and NDT
  • Testing and drying of pipework
  • Complete all flanged connections
  • Preparation and coating works associated with the project, including the grouted tee and epoxy shells if required.
  • Installation of permanent above and below ground supports and valve chambers